ENVIRONMENTAL QUALITY MONITORING

  • Project ::The Construction New Parliament House of Thailand project. (Construction phase)

    Contactor Company ::The Secretariat of the House of Representatives

    Details ::Sino-Thai Engineering and Construction Public Co., Ltd.





  • Project ::The Construction of Mass Rapid Transit Purple Line (Bang Yai –Ratburana) Bang Yai – Pranangklao Bridge section and the revised EIA for the Construction of Mass Rapid Transit Pranangklao Bridge-Bangsue section Contract 1,2,6

    Project Owner ::Mass Rapid Transit Authority of Thailand

    Contactor ::CKTC Joint Venture

    Details ::Environmental Mitigation Measures Implementation Compliance Audit and Environmental Impact Monitoring of Ambient Air, Noise and Vibration level, Surface water, Aquatic Ecology, Solid waste and Hazardous waste management, Socio-economic, attitude survey and collect statistic traffic data and accident record


  • Project ::Environmental Quality Monitoring and Audit of BLCP power plant and Coal Unloading Jetty during operation phase

    Project Owner ::BLCP Power Co., Ltd.

    Details ::Conduct environmental quality monitoring and prepare environmental mitigation measures Implementation audit report during operation phase as specified in environmental impact assessment report.





  • Project ::The Environmental Quality Monitoring during Construction Phase for Hongsa Mine Mouth Power Project, Sayapoury Province, Lao PDR

    Project Owner ::Hongsa Power Co., Ltd.

    Details ::Conduct environmental quality monitoring of ambient air quality, ambient noise level, vibration, surface water quality, groundwater quality, aquatic ecology, traffic congestion, water supply and drinking water quality during construction phase.




  • Project ::The Expansion of Sugar Factory (Operation phase)

    Project Owner ::Mitrphol Co., Ltd.

    Details ::Environmental Mitigation Measures Implementation Compliance Audit and Environmental Impact Monitoring of Ambient Air quality and Noise level, Heat, light and Noise level in Workplace, Effluent quality and Attitude Survey during operation phase

  • Project ::Thai-Malaysia Gas Pipeline and Separation Plant Project

    Project Owner ::Trans Thai-Malaysia (Thailand) Limited

    Details ::Environmental Mitigation Measures Implementation Compliance Audit and Environmental Impact Monitoring during Operation phase





  • Project ::Monitoring Survey and Basic Data Study on of Soils and Groundwater quality

    Project Owner ::Thai Oil Public Co., Ltd.

    Details ::Conduct monitoring survey and background study of soils and groundwater quality in project site under Thai Oil Business Group for annual assessment





  • Project ::Industrial Cooperation “Rak Mae Nam” (The Survey and Assessment of Water Quality on Lamtaklong Basin) under budget year 2557 (Under budget for promote the cooperation among Community, Government and Industry Sectors)

    Project Owner ::Department of Industrial Work

    Details ::Survey and conduct environmental quality sampling and analysis in Lam Ta Khong Basin Area. Evaluate existing condition and prepare water resource restoration and water quality monitoring master plan for Lam Ta Khong Basin






  • Project ::Consultancy for Environmental Quality Monitoring within the Municipality of Nonthaburi

    Project Owner ::Municipality of Nonthaburi

    Details ::Survey, Data collection, Analysis and Evaluation of environmental quality monitoring including the surface water quality and wastewater quality in the municipality of Nonthaburi area






  • Project ::Consultancy for the study and analysis of ambient air quality and noise level around road area with high pollutant risk under budget year 2012

    Project Owner ::Air and Noise Management Division, Environment Department, Bangkok Metropolitan Administration

    Details :: Monitor ambient air quality especially dust level and noise level around road area with high pollutant risk and develop the air quality and noise level database of BMA